USB Lightning Charging Cable 3M Pack of 3 Braided iPhone Charger Cable Heavy Duty Quick Charger Long Lead
£10.48
Unit price perEstimated delivery between December 05 and December 10. Order within
Pay with
Your transaction is protected with advanced security measures to keep your information confidential
Quick order list
| Variant | Variant total |
|---|---|
|
Black
£10.48
Estimated delivery between December 05 and December 10. Order within .
|
|
|
Dark Blue
£10.48
Estimated delivery between December 05 and December 10. Order within .
|
|
|
Grey
£10.48
Estimated delivery between December 05 and December 10. Order within .
|
|
|
Red
£10.48
Estimated delivery between December 05 and December 10. Order within .
|
|
|
White
£10.48
Estimated delivery between December 05 and December 10. Order within .
|
Product Information
USB Lightning Charging Cable 3M Pack of 3 Braided iPhone Charger Cable Heavy Duty Quick Charger Long Lead
Specifications:
- 2-in-1 features: Charging & Sync
- Connect your device to your PC/Laptop by USB port
- Charge Update music/data & more to your device through this data cable
- Available colours: Black, Grey, Red, White, Dark Blue.
- Available Length: 3M (Pack Of 3).
Compatible With:-
iPhone Models:
iPhone 14
iPhone 14 Plus
iPhone 14 Pro
iPhone 14 Pro Max
iPhone 13 Pro Max
iPhone 13 Pro
iPhone 13
iPhone 13 mini
iPhone 12 Pro Max
iPhone 12 Pro
iPhone 12
iPhone 12 mini
iPhone SE (3rd generation)
iPhone 11 Pro Max
iPhone 11 Pro
iPhone 11
iPhone XS Max
iPhone XS
iPhone XR
iPhone X
iPhone 8 Plus
iPhone 8
iPhone 7 Plus
iPhone 7
iPhone SE (2nd generation)
iPhone 6s Plus
iPhone 6s
iPhone 6 Plus
iPhone 6
iPhone SE (1st generation)
iPhone 5s
iPhone 5c
iPhone 5
iPad Models:
iPad Pro (5th generation)
iPad Pro (4th generation)
iPad Pro (3rd generation)
iPad Pro (2nd generation)
iPad Pro (1st generation)
iPad (8th generation)
iPad (7th generation)
iPad (6th generation)
iPad (5th generation)
iPad Mini (5th generation)
iPad Mini 4
iPad Mini 3
iPad Mini 2
iPad Mini
iPad Air (4th generation)
iPad Air (3rd generation)
iPad Air 2
A Wide Range of USB Cables
- USB Type A Cables
- USB Type C Cables
- USB Micro A Cables, USB Micro B Cables
- USB Micro B 3.0 Cables
- USB Mini A Cables, USB Mini B Cables
- USB Type B Cables
- Lightning Cables

